Under normal circumstances vinyl siding should not come loose if it was originally hung properly.
Attach flush to siding.
Outline the back of a remodeling electrical box on the siding with a pencil and cut around the outline with a keyhole saw.
White mounting block model fmntnbh04h 8 22 8 22.
Run a chalk line that connects these markings along the top of the first course of siding.
There are at least three alternative ways to do it.
Slip flashing under siding snap a chalk line cut out the siding and tack up the ledger board.
Ply gem 8 18 in.
Step 1 determine the problem.
If rotten wood is the cause a few nails will not do the trick.
Remove whatever else you require to make the attachment.
If you want to hang something from your vinyl siding don t even think about drilling through it to attach a hook to the sheathing.
Make sure you have enough room to install flashing above the ledger board and allow for at least a space above the decking preventing water from wicking upwards into wood siding.
Pay close attention to the area where the top row of siding meets the soffits.
White polypropylene mini mounting block for siding model 146100001 10 68 10 68.
Repeat this process after hanging each new course of siding.
This renders the siding vulnerable to moisture and voids the warranty even if you seal the hole.
This article will explain how to properly attach siding whether it is a few nails that need to be replaced or a whole wall that needs attention.
Wood or concrete siding will have to be cut away using a circular saw.
Well here s what the experts do.
Set the blade depth so you won t cut into the house sheathing below the siding.
Start by making an outline on the siding where you want to position the ledger board.
Remove the vinyl siding where you will be attaching.
Free delivery with 45 order.
If you don t allow vinyl siding to move it will most likely buckle and warp under the pressure.
Set your store to see local availability.
Allow for movement we cannot stress enough at ron ferris son you must allow vinyl siding to move because it typically expands and contracts 1 4 per 12 feet.
Pull the electrical wire through the back of the box then fit it in the.
If this is the top of a shed roof long level horizontal line then use a long piece of metal bent to the slope of the roof slipped behind the drainage plane of the wall and left on top of the roofing material.
Then slip flashing behind the siding covering the top edge of the ledger.