If the siding boards are 6 inches or narrower fasten each one with a single row of nails driven through the middle.
Attaching siding to a shed.
Use a razor blade to cut the wrap and nail into place with a hammer using the 1 plastic cap nails.
The most common of these being a form of hurricane tie used on the connection of a roof rafter truss to the top plate of the wall.
Make sure to nail above the siding joint so water will not seep back into the shed through the nail holes.
T1 11 comes in 4 x8 panels and has channels running vertically about every 8.
Using fasteners for framing your shed.
Installing the siding if you used sheathing on the shed walls the first thing you should do is add house wrap.
T1 11 siding is designed for installation on framing with standard 16 inch spacing.
Some local counties may require you to use metal fasteners for your shed building project.
Set the flashing on the top of the first row of siding and then attach it to the shed using roofing nails.
Your nails should be long enough to penetrate 3 4 of an inch into the wood framing of your shed to ensure it is securely attached.
You can attach them with exterior screws or galvanized nails.
3 t1 11 shed siding save t1 11 siding is made from thin layers of wood sheets or veneer plywood or wood strands osb which are glued and heat pressed and trimmed into 4 x8 panels.
T1 11 panels do not come pre primed and the texture is somewhat on the rough side.
If the siding is 8 inches or wider attach it with two equally spaced rows of nails.
If you d like your shed to resemble a quaint country cottage side it with cedar shingles.
The panels then have grooves routered every 8 inches to give it a board and batten or shiplap look.
To attach your vinyl you will need fasteners.
There are two ways to cut the siding pieces.
Nail heads shouldn t be smaller than 5 16 in diameter.
Wrap the house with house wrap or 15 mil tarpaper.
This is a plastic that helps to keep water out.
Its use does not require wall sheathing and will add structural strength to your shed walls.
When it s in the correct position attach it to the floor by nailing through the siding and into the floor frame about two inches above the bottom edge of the siding with 8d galvanized nails every 8 inches.
Set the back gable end wall vertical on the edge of the floor and center it from side to side.
Cedar shingles cedar shingles siding diagram.